Cameras for LT Panel Rooms, Transformer Yards and DG Rooms: Zone Spec
Can a camera tell you a breaker tripped or a DG set failed to start? Yes, if it gets enough pixels on the panel face: about 350 px/m to see a 22 mm indicator lamp lit or dark, about 1,000 px/m to read meter digits. Across a 1 m aisle a 3.6 mm 4 MP camera gives about 1,170 px/m. It sees the trip when it happens, not before, and it is no substitute for the permit-to-work and no-lone-worker rules in the CEA 2023 regulations.
Last checked: 15 Oct 2026. The plant layout, lamp, handle and digit sizes and the pixels-per-object targets are worked assumptions; regulation text, pixel densities, lens angles, temperatures and bitrates are sourced.
Verified against
- Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023, notification No. CEA-PS-16/1/2021-CEI Division, Gazette of India Extraordinary, 8 June 2023 (copy hosted by KSEB, archived), full text, 84 pages.
- IEC 62676-4:2014 pixel densities, quoted in the foreword of IEC 62676-4:2025 (STN EN IEC 62676-4:2026 preview); level wording from Axis, Pixel density based on IEC 62676-4:2014.
- CP Plus datasheets: CP-UNC-TA41L3C-Q, CP-UNC-TA41L6C-Q, CP-UNC-TA21L6C-Q, CP-UNC-TC41ZL6C-VMD-LQ.
- Hikvision, H.264(5) recommended bit rate sheet (archived copy); IMD, heat-wave definitions.
- Checked 15 Oct 2026.
What a camera can read on a panel
Pixels per metre (px/m) on the panel face decide what shows on the NVR. Distances use the printed 2688 px width and HFOV of two CP Plus 4 MP bullets: 78° on the 3.6 mm TA41L3C-Q, 49° on the 6 mm TA41L6C-Q. Distance is slant distance, lens to target.
| What you want to know | Object (size, assumption) | Pixels needed on it (assumption) | px/m | Max distance, 3.6 mm / 78° | Max distance, 6 mm / 49° |
|---|---|---|---|---|---|
| Breaker or feeder tripped: ON/OFF/TRIP lamp lit or dark | Pilot lamp, 22 mm | ~8 | 350 | 4.7 m | 8.4 m |
| MCCB or ACB handle up, down or in trip position | Handle, ~50 mm | ~6 | 125 (IEC Recognise) | 13.3 m | 23.6 m |
| Load, voltage or energy on a panel meter | Digit, ~14 mm tall | ~14 | 1,000 | 1.7 m | 2.9 m |
| DG AMF panel: mains fail, engine running, fail-to-start lamp | Status lamp, 22 mm | ~8 | 350 | 4.7 m | 8.4 m |
| DG AMF panel: text on the controller display | Character, ~14 mm | ~14 | 1,000 | 1.7 m | 2.9 m |
| Panel door left open, person at the panel | Door, person | — | 62.5 (IEC Observe) | 26.6 m | 47.2 m |
The px/m levels 62.5 and 125 are IEC 62676-4:2014 values; using them for lamp and handle states is our reading. The DORI explainer covers the levels, and the lens and DORI calculator works out other lenses and distances.
Across the 1 m aisle. Where only the minimum 1 m clear space sits in front of the switchboard, a camera on the opposite wall at 2.5 m height is about 1.4 m from lamp height (1.5 m). The 3.6 mm bullet then gives about 1,170 px/m: a 22 mm lamp is some 26 pixels wide and 14 mm digits about 16 pixels tall, enough to read. The cost is width: the camera sees only 2.3 m of panels, so a 10 m lineup needs five cameras, and the end sections are seen at a steep angle.
Before production stops? No. A lamp changes state when the breaker has already tripped; a camera adds no warning time. What it gives is the minute of the trip, which feeder, and whether the DG came up after a mains failure. What a lost hour costs is in the power cut and DG downtime calculator.
What the CEA 2023 regulations say about cameras
No CCTV, camera, video or surveillance requirement appears in the CEA (Measures relating to Safety and Electric Supply) Regulations, 2023 (full Gazette text searched, checked 15 Oct 2026). The regulations apply to any "person engaged in the generation or transmission or distribution or trading or supply or use of electricity" (regulation 1(3)). A factory's own LT panels, transformers and DG sets fall under them.
What the text fixes shapes camera placement:
- Clear space. "A clear space of not less than one metre in width shall be provided in front of the switchboard" (regulation 39(iii)(a)). A camera bracket or pole must not eat into it.
- Yard fencing. Outdoor substations need fencing "not less than 1.8 metre in height or other means so as to prevent access … by an unauthorised person", and the fencing must be earthed (regulation 51(ii)(a)).
- Permit and people. For shutdown work, the engineer in charge "shall obtain proper permit-to-work" and "Lone worker shall never be allowed to work on electric supply lines, equipment and apparatus or while testing" (Schedule I, Part II).
A camera does not replace either rule. A door camera can show afterwards who entered and whether a second person stood by during permit work. It cannot issue a permit or stop someone working alone.
Visible camera or thermal camera
- Visible camera for state: lamps, handles, doors, people, DG panel status (the table above).
- Thermal camera for heat on a surface it can see: a transformer bushing or an exposed cable termination in the yard. It cannot see a loose joint inside a closed steel panel, and bare metal reads wrong.
Thermal is a separate early-warning layer with its own sizing rule and status under India's fire code, covered in thermal cameras for early fire detection. Do not count a thermal camera as the room's fire detector.
Worked spec: 1 panel room + 1 transformer yard + 1 DG room
Assumption: a 12 × 6 m LT panel room with a 10 m PCC/MCC lineup and about 4.5 m clear in front of it; a 20 × 15 m fenced yard with two 11 kV/433 V transformers; a 12 × 8 m room with two DG sets.
| View (cameras) | Model, lens | Pixels × HFOV | Mount (assumption) | Scene width (m) | px/m | What it reads |
|---|---|---|---|---|---|---|
| Panel lineup (2) | CP Plus TA41L3C-Q, 3.6 mm | 2688 × 78° | 3 m high, 4.5 m out (4.74 m to lamp height), each on 5 m of panels | 7.7 | 350 | Lamps lit or dark, handles; not meter digits |
| Panel room door (1) | CP Plus TA41L6C-Q, 6 mm | 2688 × 49° | 2.5 m high, 3 m from door | 2.9 | 942 | Identify (250, IEC 2014) and Validate (500, IEC 2025) |
| Yard fence, opposite corners (2) | CP Plus TA41L3C-Q, 3.6 mm | 2688 × 78° | 6 m pole, corner | Observe to 26.6 m | ≥62.5 | Person at or over the fence |
| Yard gate (1) | CP Plus TA21L6C-Q, 6 mm | 1920 × 54° | 3 m high, 6 m out | 6.3 | 306 | Who opened the gate (Recognise) |
| DG AMF panel (1) | CP Plus TA41L6C-Q, 6 mm | 2688 × 49° | 2.5 m high, 4 m out | 3.8 | 715 | Running and fault lamps; not display text |
| DG room overview + door (1) | CP Plus TA41L3C-Q, 3.6 mm | 2688 × 78° | 4 m high, corner; door 8 m away, far corner 14.4 m | 13.5 / 23.8 | 199 / 113 | People in the room, door; Observe at far corner |
Total: 8. For meter or AMF display text, add a 6 mm camera within 2.9 m. One TC41ZL6C-VMD-LQ at its 97° wide end covers the whole 10 m lineup at 251 px/m: handles yes; lamps below the 350 px/m target (a 22 mm lamp is about 5 pixels); end panels at a steep angle.
Rules of thumb (assumption): one camera per ~5 m of lineup from 4.5 m out, or per ~2.3 m across a 1 m aisle; one per switchroom door; two opposite corners for a yard with a diagonal under 26.6 m; one per DG panel plus a room overview.
Storage for 30 days
Five mostly static views run at 12.5 fps. Hikvision's sheet gives H.265 at 2688×1520 as 4,096 Kbps at 25 fps and 2,048 Kbps at 12.5 fps, and 1080P at 25 fps as 2,048 Kbps. The CP Plus 4 MP models record at 1–25 fps.
| Cameras | fps (assumption) | Bitrate each (Kbps) | GB/day | 30 days (TB) | +30% (TB) |
|---|---|---|---|---|---|
| 2 × panel lineup, 2 × yard corner, 1 × AMF panel (4 MP) | 12.5 | 2,048 | 110.6 | 3.3 | 4.3 |
| Panel door, DG overview (4 MP) | 25 | 4,096 | 88.5 | 2.7 | 3.5 |
| Yard gate (2 MP) | 25 | 2,048 | 22.1 | 0.7 | 0.9 |
| Total, 8 cameras | — | — | 221.2 | 6.6 | 8.6 |
The 30% is the top of the 20–30% the sheet adds for complex scenes. Turn it into a disk size with the NVR days table; the loading dock spec runs the same sum for a busier scene.
What breaks in electrical areas
- The 1 m aisle. A camera on a stand or low bracket in front of panels blocks the clear space regulation 39 requires. Mount on the opposite wall or ceiling.
- Glare. Under a tube light a dark lamp can look lit. Check each lamp on the NVR with it known off.
- EMI near busbars. Run camera Cat6 in its own tray, crossing power cables at right angles, and earth the camera body to the room's earth. Never fix a camera to a panel door or busbar chamber.
- Heat. Panel rooms without AC and DG rooms with sets running get hot. The CP Plus datasheets stop at +60 °C, and IMD declares a heat wave at an actual maximum ≥45 °C. Mount away from radiator exhaust and silencer pipes.
- Yard at night. The yard is usually unlit and the cameras run on IR, which reflects off bright transformer tanks. Aim it at the fence. Ratings: IP/IK guide.
Exit routes: fire and emergency exit monitoring. Another utility room: the boiler house spec.
What to ask the installer
- Which lamps and handles each camera reads, and its px/m on the panel face.
- The printed HFOV at your focal length and the upper operating temperature.
- Mounts and cable routes approved by the electrical in-charge, clear of the 1 m space.
- At handover, switch one feeder off and check its lamp and handle on the NVR, day and night.
A trip on an LT incomer stops every line behind it. Mama connects to a factory's existing cameras over RTSP/ONVIF and reports each day, in plain language, how long machines stood idle (askthemama.com). Leave an email or phone in the form below.
FAQ
Can a CCTV camera show that a breaker has tripped? Yes, if it gets about 350 px/m on the panel face: a 22 mm lamp is then about 8 pixels, enough for lit or dark. Handle position needs about 125 px/m; meter digits about 1,000 px/m. It shows the trip as it happens, not before.
Can a camera show that the DG set did not start? At 350 px/m or more on the AMF panel it shows the mains-fail, running and fault lamps; the controller's text needs about 1,000 px/m (within 2.9 m on a 6 mm 4 MP lens).
Is CCTV mandatory in an electrical substation or panel room in India? Not under the CEA (Measures relating to Safety and Electric Supply) Regulations, 2023: the text contains no camera requirement (checked 15 Oct 2026). It requires a 1 m clear space before switchboards, 1.8 m yard fencing, permit-to-work for shutdown jobs and no lone working.
Can a camera replace the permit-to-work or the second person? No. It records who was in the room; the permit and second person stay the engineer in charge's duty.