Does PESO Require CCTV in a Fireworks Unit or Explosives Magazine?
Does PESO require cameras in your fireworks unit or magazine? No. As of 15 Oct 2026, the Explosives Rules, 2008 and their 2019, 2024, 2025 and 2026 amendments contain no CCTV requirement. Rule 22 restricts the other way: electrical equipment where explosives are made, handled or stored needs prior Chief Controller permission.
Last checked: 15 Oct 2026
By the Mama Editorial Team. General information, not legal advice. Your PESO or District Magistrate licence and its conditions bind your unit.
Verified against
- Explosives Rules, 2008, G.S.R. 907(E), 29 Dec 2008, full Gazette text with Schedules (PESO PDF).
- Explosives (Amendment) Rules, 2019, G.S.R. 17(E), 9 Jan 2019 (PESO PDF).
- Explosives (Amendment) Rules, 2024, G.S.R. 633(E), 11 Oct 2024 (PESO PDF).
- Explosives (Amendment) Rules, 2025, G.S.R. 284(E), 24 Apr 2025 (PESO PDF).
- Explosives (Amendment) Rules, 2026, G.S.R. 154(E), 2 Mar 2026 (PESO PDF).
- PESO SOP for approvals and licences under the Explosives Rules, 2008 (PESO PDF).
- Tamil Nadu Directorate of Industrial Safety and Health (DISH), report dated 18 Jul 2025, filed 21 Jul 2025 in NGT O.A. 95/2024 (SZ) and connected cases, with its fireworks SOP and the State Fire and Industrial Safety Committee minutes of 19.10.2023, 21.05.2024, 04.10.2024 and 24.02.2025 (NGT PDF).
- Supreme Court, W.P.(C) 728/2015 (Arjun Gopal), record of proceedings, 22 Jul 2026 (sci.gov.in PDF).
- Checked 15 Oct 2026.
Instrument → CCTV wording → who it applies to
| Instrument (date) | CCTV / camera wording | What it does require that touches cameras | Applies to | Source |
|---|---|---|---|---|
| Explosives Rules 2008, Rule 21 (29.12.2008) | None | Security guards "for safe custody of the factory or magazine for storage of explosives other than fireworks"; 2 m wall or fence round a manufacturing factory; guard shelter at least 30 m from a magazine | Guard duty: factories and magazines for explosives "other than fireworks"; 2 m wall: every licensed explosives manufacturing factory | Rules 2008 |
| Explosives Rules 2008, Rule 22, as amended 2019 | None | "No electrical equipment shall be used in places where explosives are being manufactured, handled or stored except with the prior permission of the Chief Controller"; type must conform to IEC, IS/IEC 60079 or IS/IEC 61241 and IS/IEC 60529 | Every licensed factory, magazine and store | Rules 2008, 2019 amdt, item 13 |
| Explosives Rules 2008, Rule 83(4)(f) | None | Shop must "have no electrical apparatus or battery… capable of producing spark or ignition"; wiring sealed or conduited; main switch outside. The 2026 amendment rewrote clause (a) and added (g) on extinguishers; (f) stands | Fireworks shops (possession and sale) | Rules 2008 |
| Explosives Rules 2008, Rule 128(4) | None | Magistrates or police inspect magazines once in six months, including "adequacy of security guards" | Magazines | Rules 2008 |
| Amendment Rules 2024 (11.10.2024) | None | Display-fireworks operators and assistants, aerial fireworks definitions | Display fireworks | 2024 amdt |
| Amendment Rules 2025 (24.04.2025) | None | Licence period in Rule 112(1) raised from five to ten financial years | All licences | 2025 amdt |
| Amendment Rules 2026 (02.03.2026) | None | Existing fireworks shops: two automatic smoke-and-heat detection systems with auto-dialler, sprinkler with 300 L and 2 HP pump, battery backup, concealed wiring with spark- or flame-proof cable, annual electrical audit; undertaking before renewal | Fireworks shops | 2026 amdt |
| TN DISH fireworks SOP, 43 points (filed 21.07.2025) | None | Max 4 persons per shed (pt 31); no manufacture 6 pm–6 am (pt 32); no mixing 11 am–3 pm (pt 16); cellphones kept in a separate room (pt 11) | Fireworks factories in Tamil Nadu | DISH report, Annexure 2 |
| TN State Fire and Industrial Safety Committee minutes (2023–2025) | None | Squad inspections, sub-lease checks, joint audits after accidents, inspection portal | Fireworks and match units | same PDF, Annexures 3–6 |
The negative, stated plainly
The words "CCTV", "closed circuit", "camera" (as equipment) and "surveillance" do not occur in the Explosives Rules, 2008 or in the 2019, 2024, 2025 and 2026 amendment notifications published by PESO (full-text search, 15 Oct 2026). The only "camera" in the 2008 text is an inquiry held "in-camera".
The licence condition sets in Part 4 of Schedule V of the 2008 Rules, starting with Set-I for District Magistrate licences to make up to 15 kg of fireworks or gunpowder, contain no camera condition either (checked 15 Oct 2026).
Tamil Nadu DISH's 43-point SOP for fireworks factories and the four State committee minutes filed with the NGT in July 2025 contain no camera direction (read 15 Oct 2026).
The Supreme Court's 22 Jul 2026 proceedings in the Arjun Gopal fireworks case deal with possible noise-based relaxation for some crackers and contain no CCTV direction.
Why fireworks owners still ask about cameras
Enforcement in Tamil Nadu is heavy. DISH reported 3,428 inspections, 1,010 show-cause notices and 101 prohibition orders in fireworks factories from 1 Apr 2024 to 31 Mar 2025 (report of 18 Jul 2025).
The same report counts 1,594 fireworks factories registered in Tamil Nadu as on 30 Jun 2025, of which 1,119 are in Virudhunagar district. Of the state total, 743 hold PESO licences and 851 Revenue Department licences; in Virudhunagar the split is 729 PESO and 390 Revenue (same report).
Accidents remain frequent. DISH recorded 16 accidents and 53 deaths in Tamil Nadu fireworks units in 2024, and 10 accidents and 34 deaths in 2025 up to 17 Jul 2025.
Most SOP points are visible facts: people per shed, work after 6 pm, mixing in the afternoon, stock outside the magazine. A camera outside the danger area records them, which is why owners ask. The duty to comply sits on the occupier with or without video.
Where a camera may and may not go
Our interpretation, not legal advice: a camera is electrical equipment, so Rule 22 applies to any camera inside a mixing shed, filling shed, magazine or store house. That means prior Chief Controller permission and an Ex-certified type. Rule 83(4)(f) bars spark-capable apparatus inside a fireworks shop.
| Location | Rule that decides | Practical camera choice |
|---|---|---|
| Inside mixing / filling / pellet sheds | Rule 22 (prior permission; IS/IEC 60079 or 61241 type) | Avoid, or Ex-certified with written PESO permission; see explosion-proof CCTV and PESO approval |
| Inside magazine or store house | Rule 22 | Same as above |
| Outside the safety distance: gate, boundary wall, drying yard approach, burning pit approach | Not in Rule 22's text | Ordinary outdoor IP camera; see perimeter camera spec |
| Fireworks shop interior | Rule 83(4)(f) | No spark-capable apparatus inside; watch the door from outside |
| Office, worker entry, vehicle bay | No explosives rule | Ordinary camera; check STQC status in the Certified CCTV Finder |
Fireworks dust and static are the hazards here, so the dust-protection codes in IS/IEC 61241 or 60079 (Ex t) matter as much as gas groups. Rule 22 names both families.
What breaks in a fireworks unit
- Heat. DISH bans mixing between 11 am and 3 pm for heat. Outdoor cameras on tin roofs in Virudhunagar summers run hot; specify the rated ambient.
- Lightning. Specification 3 of Schedule VII calls for a lightning conductor to IS 2309 in some sheds, and the 19.10.2023 committee minutes asked for arrester coverage of "the whole premises". Camera poles and cable runs need surge protection and proper earthing.
- Long cable runs. The DISH SOP keeps the mixing shed 18 m from other sheds, or 21 m above 50 kg of chemicals; cameras on the boundary can be 100 m or more from the recorder. Plan fibre or PoE extenders.
- Power cuts. A recorder without UPS loses footage exactly when a fire trips the supply.
- Phones kept outside. SOP point 11 moves cellphones to a separate room, so live view is for the office, not the shed floor.
When to call PESO / the installer
- PESO circle office: Is any proposed camera inside a licensed area? If yes, what permission under Rule 22 do you need?
- Installer: Provide a site plan with every camera outside the danger zones marked, Ex certificate and PESO approval letter for anything inside, surge protection and UPS runtime.
For the wider question, see is CCTV mandatory in Indian factories, and for fire inspections, Fire NOC and CCTV by state. Workers must be told about cameras: see the DPDP worker CCTV notice.
Where Mama fits
Mama reads a unit's existing cameras over RTSP/ONVIF and each morning tells the owner, in plain language, where production hours were lost. In a fireworks unit that means cameras outside the danger area only; Mama does not replace the licence, the foreman or the inspection. To check what your cameras can show, leave an email or phone in the form below.
FAQ
Is CCTV mandatory in a fireworks factory in Tamil Nadu?
Not under the explosives law or the DISH SOP. As of 15 Oct 2026, neither the Explosives Rules, 2008 with the amendments PESO publishes up to March 2026 nor the 43-point DISH fireworks SOP filed with the NGT in July 2025 requires CCTV. Your factory licence conditions still bind your unit.
Can I put a CCTV camera inside an explosives magazine?
Only with the Chief Controller's prior permission under Rule 22, and only a type conforming to IS/IEC 60079 or 61241 and IS/IEC 60529. A standard dome camera does not qualify.
Does a fireworks shop need cameras under the 2026 amendment?
No. The 2 Mar 2026 amendment requires fire detection with an auto-dialler, a sprinkler, battery backup and an annual electrical audit for existing fireworks shops. Cameras are not mentioned.