mama Get a free camera plan ☰

BIS CCTV Registrations Expiring by April 2027: 10 R-Numbers, Dates and What Happens Next (India)

By The Mama Editorial Team · Factory-floor cameras, India compliance & operations

As of 14 Oct 2026, 10 of the 83 R-numbers on BIS's "ER Certified CCTV" list reach their validity date between 14 Oct 2026 and 14 Apr 2027. They cover 286 model strings: 146 in the security-ER column and 140 analogue. The first, March Networks R-41240982, runs to 17 Nov 2026. All 10 still read Registered.

Last checked: 14 Oct 2026.

Verified against

R-numbers with validity dates from 14 Oct 2026 to 14 Apr 2027

Filter: cert_scheme = BIS-CRS, confidence = primary, cert_valid_to between 2026-10-14 and 2027-04-14. "Renewal filing due" is the validity date minus three months, from Scheme-II para 9(1) of the 2026 amendment. It is our calculation, not a BIS date. Full rows: /static/data/bis-cctv-registrations-expiring-next-6-months.csv.

Brand (as printed) R-number Manufacturer per BIS (country) Valid to Days left (from 14 Oct 2026) Renewal filing due (calc.) ER / analogue models (#)
MARCH networks R-41240982 Vivotek Inc. (Taiwan) 17 Nov 2026 34 17 Aug 2026 (passed) 2 / 0
Qubo R-66001546 Ail Dixon Technologies (India) 19 Nov 2026 36 19 Aug 2026 (passed) 5 / 0
i-PRO R-41245950 i-PRO Co., Ltd. (Japan) 2 Jan 2027 80 2 Oct 2026 (passed) 16 / 0
PRAMA R-71014834 Prama India (India) 8 Feb 2027 117 8 Nov 2026 77 / 116
MEDIATRONIX WITH LOGO R-64000817 Mediatronix (India) 11 Feb 2027 120 11 Nov 2026 2 / 0
(blank) R-61005576 Lookman Distribution (India) 24 Feb 2027 133 24 Nov 2026 0 / 10
(blank) R-81005088 Logitech Inc. (India) 26 Feb 2027 135 26 Nov 2026 0 / 9
Honeywell R-91003883 Honeywell International India (India) 27 Feb 2027 136 27 Nov 2026 44 / 0
(blank) R-91007803 Novus Hi-Tech Robotic Systemz (India) 25 Mar 2027 162 25 Dec 2026 0 / 2
(blank) R-59000540 Shrivari Electoindus (India) 27 Mar 2027 164 27 Dec 2026 0 / 3

Source for every row: BIS ER list, checked 14 Oct 2026.

Just outside the window, DBS Security Systems R-81012416 (2 analogue models) shows validity 13 Oct 2026 and the status Deferred on 14 Oct 2026.

Where brands differ

Brand-by-brand view of all 83 rows: BIS-registered CCTV brands A–Z.

What happens when a BIS CRS registration lapses

Primary texts only:

  1. Validity and renewal. Since 25 Feb 2026 a Scheme-II licence is "granted initially for up to five years" and "may be renewed for a further period of up to five years". Renewal "shall be made before three months of its expiration" in Form VI (Gazette, 25 Feb 2026, Scheme-II paras 8–9). The 2022 BIS FAQ still says two years; the 2026 text replaces it.
  2. No automatic retest. "Repeat testing is not specifically envisaged" at renewal; BIS picks samples during surveillance (CRS FAQ, Q13).
  3. Missed date: up to 90 days' deferment. If no renewal application arrives within validity, BIS may defer the decision for up to 90 days; a late application carries a ₹5,000 late fee under regulation 8(5) of the 2018 Regulations, as quoted in BIS's letter template (RG:03, paras 2–3 and Annexure-I). The 2026 amendment substituted regulation 8(2) and inserted 8(10)–(12); it did not amend 8(5).
  4. No renewal filed: stock in hand stops at the validity date. Where no renewal application reached BIS within validity, BIS's deferment letter tells the maker it is "not authorized to mark and dispatch (including stock in hand)" after the validity date, and asks for stock held with warehouse, dealer, distributor and in transit (RG:03, Annexure-I para 3).
  5. Then it expires. Without a renewal application and fees within 90 days, the licence "shall stand expired"; under suspension the limit is 180 days (RG:03 para 5). On expiry the licensee must "discontinue forthwith" its self-declaration and withdraw promotional matter (Gazette 2026, Scheme-II grant-letter template, para 8).
  6. Annual fees matter too. Under the 2026 amendment, if the annual fee with production statement is late, the licence is suspended for 90 days, then cancelled if still unpaid; paying within those 90 days with a ₹5,000 late fee revokes the suspension (regulation 8(11), as inserted).

Separately, no CCTV camera that fails the security ER may be sold from 1 Apr 2026 (MeitY OM, 16 Jan 2026); analogue cameras are outside the ER (BIS circular, 1 Apr 2025).

The documents above contain no rule that requires removing installed cameras when the maker's R-number lapses, and none on reselling units dispatched to dealers before the validity date (checked 14 Oct 2026). For installed systems, see do I have to replace my CCTV in 2026.

What a buyer should check

  1. Copy the exact model string from the quote, suffix included.
  2. Run it through the CCTV certificate checker to get the R-number and validity.
  3. If the date falls before your delivery or final phase, ask the vendor for the renewal application or the renewed R-number. BIS's own ER list shows validity but no renewal flag.
  4. Check the status reads Registered, not Deferred, Expired or Cancelled. Steps: how to check a BIS R-number.
  5. For a government-linked order, check the STQC report separately; the split is in STQC ER vs BIS CRS vs PPO.

What breaks in a factory

When to call the installer / what to ask the vendor

Ask in writing, per model: the R-number, its validity, whether renewal was filed and when, and the BIS list row. Brands absent from both lists are covered in CCTV brands missing from India's certification lists.

A valid R-number says nothing about whether cameras see the machines that cost money when idle. Mama reads a factory's existing cameras over RTSP/ONVIF and tells the owner each morning where machines stood idle. Leave an email or phone in the form below.

FAQ

What is the validity of a BIS CRS registration? Under the Scheme-II text substituted on 25 Feb 2026, a licence is granted for up to five years and can be renewed for up to five more. Each R-number's own date is printed in the Validity column of BIS's list.

How do I renew a BIS CRS registration? The manufacturer files Form VI on the BIS portal three months before expiry and pays the fees annually in advance. A late application within 90 days of validity carries a ₹5,000 late fee under RG:03.

Can a product be sold after its BIS registration expires? Where no renewal application was filed within validity, BIS's deferment letter says the maker may not mark or dispatch goods, including stock in hand, with the Standard Mark after the validity date (RG:03, Annexure-I). No BIS document checked on 14 Oct 2026 addresses units already sold to dealers before that date. Buyers should ask for the renewed R-number before ordering.

Last verified 14 Oct 2026 against the vendor and regulator documents listed above. Found an error? Tell Mama in the form below.

Read next
Free · no obligation

Get a camera plan for your floor

Tell Mama about your plant and Mama will come back with how many cameras you need, where they go, and the retention your state expects — sized to your floor, in ₹. Built for Indian factories.

  • How many cameras & exact placement
  • Compliance-ready (BIS/STQC, women's night shift)
  • Honest ₹ estimate — guard vs camera-AI

Mama replies by email or phone — whichever you left. No spam, no obligation.