mama Get a free camera plan ☰
Tools

Factory Improvement Methods Navigator

Start from what you see on your floor and get the method that fixes it: 62 methods from SMED and TPM to kanban, what to measure before and after, 131 results from real plants (36 in India) and 78 training programmes in India. Data as of

Loading the methods

About this data

The Navigator holds 62 improvement methods and tools, from SMED and TPM to kanban, SPC and daily management, each tied to the problems an owner sees on the floor (25 of them). For every method it shows what to measure before you start and after, and how to get that number with your own staff: a stopwatch, a downtime log, a check sheet or a video of the job

The 131 results are before/after numbers taken from published sources, 36 of them from Indian plants. Each number carries the type of its source: a peer-reviewed study, a review of studies, a case study, or a figure reported by a vendor or consultant. Most published results come from a single plant, and each such number is marked "single-plant case". Treat them as what a method has achieved somewhere, not as a promise for your plant. Timelines and costs appear only where a source prints them

The Training tab lists 78 programmes that are open or running now, from the National Productivity Council, MSME centres, industry bodies and institutes, filtered by role from owner/MD to operator. Fees and dates are as each provider publishes them; check with the provider before you enrol

Methods covered: 5-Why root cause analysis, 5S, 8D problem solving, A3 problem solving, ABC/XYZ inventory classification, Assembly line balancing, Automated visual inspection, Autonomous maintenance, Cellular manufacturing, CMMS / digital maintenance log, Compressed-air leak detection and repair, CONWIP, Cost of Poor Quality, Daily management, Demand-Driven MRP, Design of Experiments, Employee suggestion system, Energy management system and energy audits, Finite-capacity scheduling, Gemba walk, Heijunka, Hoshin kanri, In-plant milk-run with supermarket, IoT machine monitoring, Ishikawa, ISO 9001 quality management system, Jidoka and andon, Just-in-Time, Kaizen, Kanban, Line-side kitting, Measurement System Analysis, OEE measurement, Overall Labour Effectiveness, Pareto analysis, Plant layout redesign, Poka-yoke, Predictive maintenance, Preventive, Process FMEA, Quality circles, Quick Response Manufacturing, Reliability-centred maintenance, Sales and Operations Planning, Six Sigma, Skill matrix and cross-training, SMED, Spaghetti diagram, Standardised work, Statistical Process Control, Supplier development, Takt time planning, Theory of Constraints, Time and motion study, TPM, TWI Job Instruction, Value analysis / value engineering, Value Stream Mapping, Vendor-managed inventory, Visual management, Work sampling, Workstation ergonomics

Read next: OEE explained, with a rupee example, the real cost of factory downtime, SKU changeover on packing lines (SMED)

Prepared by Mama from published studies, case reports and providers' own pages · data as of 17 Oct 2026
Want to see where your floor loses time? Get a free camera plan
Free · no obligation

Get a camera plan for your floor

Tell Mama about your plant and Mama will come back with how many cameras you need, where they go, and the retention your state expects — sized to your floor, in ₹. Built for Indian factories.

  • How many cameras & exact placement
  • Compliance-ready (BIS/STQC, women's night shift)
  • Honest ₹ estimate — guard vs camera-AI

Mama replies by email or phone — whichever you left. No spam, no obligation.