mama Get a free camera plan ☰
Self-test

Which step is your plant on?

Ten questions, two minutes. Your step on a five-step supplier ladder, how your plant compares with Indian figures, and three next moves with the ₹ effect

Prepared by Mama from published studies and Indian government data · last checked

Loading the test

Last checked: 20 Oct 2026

How the test works

  • 10 questions, about 2 minutes. Seven ask what your floor does today, two where your money goes, one what you want from the next 12 months.
  • You get a step, not a score. Your step is the middle of your answers, held back by your weakest one: a plant cannot stand on step 4 with a step-1 foundation. If your press answer held you back, the result says so first.
  • You get a band, if you know one number. Enter last year's gross value added (GVA) per person and your trade. The result places it against MoSPI's Annual Survey of Industries (ASI) averages.
  • Your three moves are ranked for you, by whether your money leaks through idle machines, scrap, escalations or lost RFQs.

What "GVA per person" means here: sales plus stock change, minus materials, fuel, power, job work and repairs, divided by everyone engaged, contract workers included. It is the ASI method, so your number compares with theirs.

The five steps

Step What it looks like Metric that marks the step Primary benchmark
1. We firefight Parts ship. Quality and stops are known when the customer calls Complaints closed with a real 8D Problem solving (10.2.3) tops IATF's worldwide chart of major nonconformities: chart value 563, no unit shown, 12 months to 23 Apr 2026
2. We keep the certificate IATF or ISO 9001 on the wall, PPM tracked monthly by customer In-house rejection in rupees Materials are 65.3% of auto-parts output, profit 8.3% (ASI 2023-24)
3. We measure every line OEE and rejection known by machine, reviewed every morning OEE on the bottleneck, daily No Indian national OEE dataset; published Indian cases start at 37–48%
4. We remove losses Lean and TPM run as a system Breakdowns and changeovers trended About 70 TPM companies: breakdowns −25–40% in year 1 (CII TPM Club India, 2021)
5. We win new programmes Freed hours become RFQs, EV and export parts GVA per person above your trade's average Auto parts ₹10.92 lakh; Maharashtra 12.96; vehicle makers 38.62 (ASI 2023-24)

The band. ASI 2023-24 gives GVA per person for auto parts (₹10.92 lakh), forging and stamping (₹9.41 lakh), iron castings (₹10.72 lakh), non-ferrous castings (₹7.69 lakh) and plastics (₹8.97 lakh). By state, auto parts run from ₹6.59 lakh in Karnataka to ₹20.4 lakh in Rajasthan. ASI has no split by factory size, and product mix moves the number, so read it as a direction, not a verdict.

What a point is worth. In a worked example, a 40-CNC shop on two shifts has 1,92,000 planned machine hours a year. At an illustrative ₹1,000 contribution per cutting hour, one point of spindle utilisation is worth about ₹19 lakh a year. Use your own numbers in the machine hour rate calculator.

Your first three moves, step by step

Each move card in the tool shows what changes, the ₹ effect (sourced or a labelled assumption), cost, time, payback and government support.

Step 1: We firefight

  1. Log every stop over 5 minutes on your busiest cell for 10 days. In US government audits of 658 auto-parts plants, productivity measures were 3.1% of recommendations but 14.1% of savings, with a median payback of 0.52 years (US data).
  2. Close every complaint with a real 8D. IATF's own interpretation lists six elements, from containment to an updated PFMEA and control plan. One complaint costs ₹2.4–4.9 lakh in a worked example.
  3. A signed pre-start check on every press, every shift. In Safe in India's CRUSHED 2026 data, 95% of press injuries were on presses without a safety sensor.

Step 2: We keep the certificate

  1. Put a rupee figure on in-house rejection, by part and machine. At the ASI cost mix, one point of rejection in a ₹120 crore plant is worth ₹55–80 lakh a year.
  2. First-off approval at the machine, signed before the lot runs. Set-up verification and the control plan are on both IATF top-10 lists.
  3. Claim the certification money. ZED Bronze's ₹10,000 fee is offset by a ₹10,000 joining reward. Maharashtra refunds 75% of quality certification cost, Karnataka 50% up to ₹5 lakh.

Step 3: We measure every line

  1. An hourly board by machine and a 15-minute morning review. In a randomised trial in Indian textile firms, daily meetings and boards raised productivity 17% in the first year (Bloom et al., 2013).
  2. Quick changeover (SMED). In one forging plant, die changeover time fell 43–45% (2024).
  3. Break the setter queue with a skill matrix and a second setter. In US audits, operator training paid back in a median 0.31 years.

Step 4: We remove losses

  1. Planned maintenance with MTBF on the bottleneck. One North Indian unit cut breakdown time 23% and raised OEE 17% with TPM (2018).
  2. Join a structured cluster. ACMA reports 211 plants in its Advance Lean Cluster, ₹348 crore of savings and an average payback under 70 days. These are ACMA's own programme figures.
  3. Get a funded energy and compressed-air walk-through. In US audits of 1,783 metal-trade plants, fixing air leaks paid back in a median 0.20 years. ADEETIE refunds an energy audit up to ₹1 lakh for medium units in listed forging and foundry clusters.

Step 5: We win new programmes

  1. Quote the next RFQ on measured hours before you buy a machine. In a worked 12-machine cell, recovered losses alone are worth about ₹4.4 lakh a month of sellable capacity.
  2. Bid for import-substitution and EV carry-over parts. India imported US$12.3 billion of components against US$12.1 billion exported in H1 FY26, and EVs were 4.6% of supplies to OEMs (ACMA).
  3. Turn your system into export proof. Tamil Nadu refunds certification required by importing countries up to ₹10 lakh. Only about 2% of ZED certificates are above Bronze.

A note on government support. The ZED and Lean guidelines print a validity to 31 March 2026; no extension order was found on msme.gov.in or dcmsme.gov.in (checked 17 Oct 2026). A Ministry of MSME release of 4 August 2026 still describes ZED as operating. Ask your MSME-DFO in writing before you count on a subsidy. PLI Auto is not a route for most medium plants: it required ₹500 crore group revenue on FY2020-21 accounts. ACMA's cluster programmes are mainly for members, and Mama cannot promise access. Details are in government money for auto-component suppliers in 2026.

Where Mama fits

On steps 1 to 3 the hard part is seeing which machines stood, and why. A clipboard and reason codes work. Mama is another option: it reads the cameras a plant already has and sends the owner a short morning note on which presses and CNCs stood, and for how long. It watches machines and flows and never ranks operators. From step 4 up, the moves are about maintenance, clusters and customers, and the cards say so.

Get a free camera plan · Leave an email or phone in the form and Mama will get back to you

FAQ

Is this an IATF, ZED or ACMA maturity level? No. It is a self-check for owners. For official levels, see ZED (Bronze, Silver, Gold) and the MSME Lean scheme (Basic, Intermediate, Advanced). IATF 16949 is a certificate, not a level, and your certification body decides what conforms.

Why GVA per person and not OEE or PPM? India has no published national OEE or PPM dataset. ASI value added per person is the only official benchmark for auto-component plants, published by state and trade. It has no split by plant size, so the result shows a band, not a rank.

My GVA per person is below the average but I answered step 4. Which is right? Possibly both. Labour-heavy work such as harnesses and assembly sits lower without any inefficiency, and contract labour booked as job work distorts the ratio. If neither applies, unsold machine hours are the usual cause: start with 10 days of stop records.

Do government schemes pay for cameras or software? No. ZED and Lean pay for assessment, certification and consultants. ADEETIE and state policies pay for energy audits, certification and some equipment. None of them covers camera systems, including Mama.

Sources for every figure are listed below. ₹ figures marked as worked examples are illustrative; replace them with your own numbers

Assumptions behind the ₹ figures
  • A1 A 40-CNC Tier-2 shop on two 8-hour shifts, 300 days: 1,92,000 planned machine hours a year. Each cutting hour earns an illustrative ₹1,000 of contribution, and half of every recovered machine hour becomes cutting time. One point of spindle utilisation (1% of planned hours spent cutting) is then worth about ₹19 lakh a year. Per move in the same example: first-piece wait ₹25 lakh, changeover ₹24 lakh, shift edges ₹20 lakh, setter queue ₹10 lakh, breakdowns ₹9 lakh. Replace with your own hours and contribution
  • A2 A ₹120 crore plant with the ASI 2023-24 cost mix of NIC 293 (materials 65.3% of output). One point of rejection burns about ₹78 lakh of material a year; at an assumed 30% scrap recovery the net loss is about ₹55 lakh before conversion cost, so a one-point cut is worth ₹55-80 lakh a year
  • A3 One customer complaint on six bad brackets: about ₹2.4 lakh with a month of in-house controlled shipping, about ₹4.9 lakh with a third-party sorting wall
  • A4 A 12-machine CNC cell, 416 staffed hours per machine a month, cutting share raised from 55% to 65% by fixing setups and first-piece waits, quoted at ₹900 per machine hour: about ₹4.4 lakh a month of sellable capacity from recovered losses alone. A new VMC is assumed at ₹25 lakh before tooling
  • A5 Ranges on move cards are Mama's conservative editorial estimates, set at or below the published effect because most studies are single plants, programme self-reports or outside India. They are not forecasts for your plant. The GVA band cut-offs (0.75x and 1.2x your trade's Indian average) are editorial too
  • A6 A press operator aged 25 on an illustrative ₹15,000 a month loses two fingers of one hand: compensation about ₹3.9 lakh (20% of 60% of wages x age factor 216.91), plus a fine of ₹2-4 lakh where a breach of duty caused it
  • A7 Re-PPAP after moving a three-CNC cell: tests, studies and paperwork about ₹82,500 at published Indian lab rates; each week the approval slips costs about ₹3.5 lakh in idle machine hours at an assumed ₹1,200 machine-hour rate
Sources
  • S01 IATF top-10 major and minor nonconformities (12 months to 23 Apr 2026); India 7,820 IATF 16949 certificates, China 63,293 vda-qmc.de, 2026
  • S02 IATF 16949 Sanctioned Interpretations Nov 2025: SI 20 problem-solving elements; SI 3 contingency plans iatfglobaloversight.org, 2025
  • S03 IATF 16949 FAQs June 2026: first-off when applicable; periodic overhaul and MTBR; MSA gauge families iatfglobaloversight.org, 2026
  • S04 IATF Rules 6th ed. SIs June 2026: 15 days major / 60 days minor response; 90-day special audit; suspension iatfglobaloversight.org, 2026
  • S05 ASI 2023-24 Volume I: GVA, labour cost, fuel, contract share per person by NIC and by state microdata.gov.in, 2024
  • S06 ASI 2023-24 via MoSPI API, NIC 293: cost mix (materials 65.3%, profit 8.3%), states incl. UP and Rajasthan api.mospi.gov.in, 2024
  • S07 US DOE ITAC database: auto-parts plants and four metal trades, shares, medians, paybacks, take-up (Mama count) itac.university, 2026
  • S08 CRUSHED 2026: press injuries in Haryana and Maharashtra auto-component units safeinindia.org, 2026
  • S10 Code on Social Security, 2020: s.76 compensation, Fourth and Sixth Schedules egazette.gov.in, 2020
  • S11 OSH Code, 2020: s.103 penalties egazette.gov.in, 2020
  • S12 MANN+HUMMEL CSL1/CSL2 instructions: signed reply and 8D within 24 h; CSL1 own 100% containment, CSL2 approved third party; unlabelled CSL parts sorted at customer at supplier expense; exit after 1 month or 3 batches mann-hummel.com, 2014
  • S13 ACMA H1 FY26: imports US$12.3 bn, exports US$12.1 bn, EV 4.6% of OEM supplies acma.in, 2026
  • S14 ACMA FY25: export destinations, North America 32%, Europe 29.5% acma.in, 2025
  • S15 ACMA IMPACT Vol. 19 No. 2 (July 2026): Advance Lean Cluster 211 plants, ₹348 crore, payback under 70 days; ZDQ 18 months; Pillar-3 and SDP results acma.in, 2026
  • S16 SMED in a forging plant: changeover -43% to -45%, OEE 70% after ideas.repec.org, 2024
  • S17 TPM in a North Indian unit: breakdown time -23.14%, OEE +17.08%, production +15.63% ideas.repec.org, 2018
  • S18 Planned maintenance in ~70 TPM companies: breakdowns -25-40% / -40-60% / -70-80%; 26-39 weeks tpmclubindia.org, 2021
  • S19 Management practices raised productivity 17% in first year, Indian textile firms, RCT ideas.repec.org, 2013
  • S20 Same trial: quality defects index -32%; implementation cost under US$3,000 per firm excluding consulting nber.org, 2010
  • S21 ZED fees, joining reward, subsidy by size, validity; PIB 4 Aug 2026: ZED operating, 75% up to ₹50,000 zed.msme.gov.in, 2026
  • S22 MSME Lean scheme: levels, caps, 90% share, durations, group rule, validity dcmsme.gov.in, 2022
  • S23 ZED dashboard: about 2% of certificates above Bronze (Oct 2026) zed.msme.gov.in, 2026
  • S24 ADEETIE: audit reimbursement, interest subvention, sectors incl. forging and foundry, period beeindia.gov.in, 2026
  • S25 Tamil Nadu MSME Policy 2021 (G.O.(Ms) No.37): thrust-sector subsidy needs ISO 9001/IATF; Q-CERT; energy audit 75% up to ₹1 lakh tnswp.com, 2021
  • S26 Maharashtra IISP 2025: quality certification 75%; energy audit 50% up to ₹2 lakh; energy-efficiency equipment 50% up to ₹5 lakh midc.maharashtra.gov.in, 2025
  • S27 Karnataka Industrial Policy 2025-30: quality certification 50% up to ₹5 lakh; export certification 50% up to ₹5 lakh investkarnataka.co.in, 2025
  • S28 NPC e-learning course fees npcindia.gov.in, 2026
  • S29 IMTMA Training fees: SMED, MSA, problem-solving, Lean DWM, Zero Down Time imtmatraining.com, 2026
  • S30 PLI Auto notification S.O. 3946(E): Component Champion thresholds pliauto.in, 2021
  • S31 US Proclamation 10908: 25% tariff on listed automobile parts federalregister.gov, 2025
  • S32 Lean Sigma in an Indian die-casting SME: OEE 0.48 to 0.83 strathprints.strath.ac.uk, 2006
  • S33 Jishu Hozen, Maharashtra plant: one machine OEE 37.65% to 77.62% doi.org, 2018
  • S34 Sheet-metal unit, central India: cost of internal failure -40% with on-line inspection imeko.org, 2007
  • S35 UNIDO evaluation of the UNIDO-ACMA-DHI programme: cost competitiveness +13.3%; value added per employee far below comparators downloads.unido.org, 2018
  • S36 8D at a valve-spring maker: rejection 17.07% to 4.91% doi.org, 2017

Want to see where your plant loses time? Get a free camera plan

Free · no obligation

Get a camera plan for your floor

Tell Mama about your plant and Mama will come back with how many cameras you need, where they go, and the retention your state expects — sized to your floor, in ₹. Built for Indian factories.

  • How many cameras & exact placement
  • Compliance-ready (BIS/STQC, women's night shift)
  • Honest ₹ estimate — guard vs camera-AI

Mama replies by email or phone — whichever you left. No spam, no obligation.