Ten questions, two minutes. Your step on a five-step supplier ladder, how your plant compares with Indian figures, and three next moves with the ₹ effect
Loading the test
Last checked: 20 Oct 2026
What "GVA per person" means here: sales plus stock change, minus materials, fuel, power, job work and repairs, divided by everyone engaged, contract workers included. It is the ASI method, so your number compares with theirs.
| Step | What it looks like | Metric that marks the step | Primary benchmark |
|---|---|---|---|
| 1. We firefight | Parts ship. Quality and stops are known when the customer calls | Complaints closed with a real 8D | Problem solving (10.2.3) tops IATF's worldwide chart of major nonconformities: chart value 563, no unit shown, 12 months to 23 Apr 2026 |
| 2. We keep the certificate | IATF or ISO 9001 on the wall, PPM tracked monthly by customer | In-house rejection in rupees | Materials are 65.3% of auto-parts output, profit 8.3% (ASI 2023-24) |
| 3. We measure every line | OEE and rejection known by machine, reviewed every morning | OEE on the bottleneck, daily | No Indian national OEE dataset; published Indian cases start at 37–48% |
| 4. We remove losses | Lean and TPM run as a system | Breakdowns and changeovers trended | About 70 TPM companies: breakdowns −25–40% in year 1 (CII TPM Club India, 2021) |
| 5. We win new programmes | Freed hours become RFQs, EV and export parts | GVA per person above your trade's average | Auto parts ₹10.92 lakh; Maharashtra 12.96; vehicle makers 38.62 (ASI 2023-24) |
The band. ASI 2023-24 gives GVA per person for auto parts (₹10.92 lakh), forging and stamping (₹9.41 lakh), iron castings (₹10.72 lakh), non-ferrous castings (₹7.69 lakh) and plastics (₹8.97 lakh). By state, auto parts run from ₹6.59 lakh in Karnataka to ₹20.4 lakh in Rajasthan. ASI has no split by factory size, and product mix moves the number, so read it as a direction, not a verdict.
What a point is worth. In a worked example, a 40-CNC shop on two shifts has 1,92,000 planned machine hours a year. At an illustrative ₹1,000 contribution per cutting hour, one point of spindle utilisation is worth about ₹19 lakh a year. Use your own numbers in the machine hour rate calculator.
Each move card in the tool shows what changes, the ₹ effect (sourced or a labelled assumption), cost, time, payback and government support.
A note on government support. The ZED and Lean guidelines print a validity to 31 March 2026; no extension order was found on msme.gov.in or dcmsme.gov.in (checked 17 Oct 2026). A Ministry of MSME release of 4 August 2026 still describes ZED as operating. Ask your MSME-DFO in writing before you count on a subsidy. PLI Auto is not a route for most medium plants: it required ₹500 crore group revenue on FY2020-21 accounts. ACMA's cluster programmes are mainly for members, and Mama cannot promise access. Details are in government money for auto-component suppliers in 2026.
On steps 1 to 3 the hard part is seeing which machines stood, and why. A clipboard and reason codes work. Mama is another option: it reads the cameras a plant already has and sends the owner a short morning note on which presses and CNCs stood, and for how long. It watches machines and flows and never ranks operators. From step 4 up, the moves are about maintenance, clusters and customers, and the cards say so.
Get a free camera plan · Leave an email or phone in the form and Mama will get back to you
Is this an IATF, ZED or ACMA maturity level? No. It is a self-check for owners. For official levels, see ZED (Bronze, Silver, Gold) and the MSME Lean scheme (Basic, Intermediate, Advanced). IATF 16949 is a certificate, not a level, and your certification body decides what conforms.
Why GVA per person and not OEE or PPM? India has no published national OEE or PPM dataset. ASI value added per person is the only official benchmark for auto-component plants, published by state and trade. It has no split by plant size, so the result shows a band, not a rank.
My GVA per person is below the average but I answered step 4. Which is right? Possibly both. Labour-heavy work such as harnesses and assembly sits lower without any inefficiency, and contract labour booked as job work distorts the ratio. If neither applies, unsold machine hours are the usual cause: start with 10 days of stop records.
Do government schemes pay for cameras or software? No. ZED and Lean pay for assessment, certification and consultants. ADEETIE and state policies pay for energy audits, certification and some equipment. None of them covers camera systems, including Mama.
Sources for every figure are listed below. ₹ figures marked as worked examples are illustrative; replace them with your own numbers
Want to see where your plant loses time? Get a free camera plan
Tell Mama about your plant and Mama will come back with how many cameras you need, where they go, and the retention your state expects — sized to your floor, in ₹. Built for Indian factories.