CCTV in a MOOWR / Bonded Unit: What Customs Expects
Is CCTV legally required in a MOOWR unit? As of 15 Oct 2026, no: the MOOWR (No. 2) Regulations, 2019 contain no CCTV clause. The Section 65 licence form (Circular 34/2019, now on ICEGATE 2.0) has three required CCTV questions, including how many recording days you keep. Only special warehouses get a written "CCTV at the gates" instruction.
Last checked: 15 Oct 2026
By the Mama Editorial Team, for owners applying for or running a Section 65 (MOOWR) unit. Not legal advice.
Verified against
- Manufacture and Other Operations in Warehouse (No. 2) Regulations, 2019, Notification 69/2019-Customs (N.T.), 1 Oct 2019, regulations 8, 9 and 17 as published on CBIC's tax information portal
- Circular 34/2019-Customs, 1 Oct 2019: procedure for Section 65 units, Annexure A (application form)
- Circular 26/2016-Customs, 9 Jun 2016, as amended 31 Jul 2020: warehouse licence application form
- Circular 36/2020-Customs, 17 Aug 2020: Section 65 in special warehouses (MOOSWR)
- Private Warehouse Licensing Regulations, 2016, regulation 3, and the Warehouse (Custody and Handling of Goods) Regulations, 2016, regulation 4 (CBIC portal)
- Circular 25/2020-Customs, 18 May 2020: RFID e-sealing circulars rescinded
- Circular 19/2024-Customs, 30 Sep 2024, and Circular 28/2025-Customs, 15 Nov 2025: online licensing and Section 65 module
- ICEGATE, User Manual – Warehouse Licensing on ICEGATE 2.0, v1.16, 18 Nov 2025, page 27
- CBIC customs circular lists for 2016 and 2018–2026, searched for warehouse, sealing, CCTV and camera. Checked 15 Oct 2026.
Every customs text, clause by clause
| Instrument | Clause | What it says about security | CCTV duty | Recording period (days) | Source |
|---|---|---|---|---|---|
| MOOWR (No. 2) Regulations, 2019 | Reg. 8 | Signage; a "computerized system for accounting"; facilities, equipment and personnel "sufficient to control access to the warehouse, provide secure storage" | No (no camera word in the text) | None set | CBIC |
| Private Warehouse Licensing Regulations, 2016 | Reg. 3(2)(e)(i)–(ii) | No licence if the site "is not suitable for secure storage of dutiable goods" or "for general supervision by officers of customs" | No | None set | CBIC |
| Warehouse (Custody and Handling of Goods) Regulations, 2016 | Reg. 4 | Sturdy doors, secure locks, signage, examination space, computerised accounts. Applies to non-Section 65 bonded warehouses | No | None set | CBIC; scope per Circular 34/2019 para 3 |
| Circular 26/2016 (licence form, all bonded warehouses) | Para 3; Part II security questions | "Absence of certain features (for example, absence of CCTVs or burglar alarms in case of certain types of sites) shall be acceptable in some situations" | Asked, not mandatory | You state it | CBIC |
| Circular 34/2019 (MOOWR) | Para 13; Annexure A Part II item 10(ii) | Boundary walls, gates with access control, personnel; form asks if CCTV covers "the surrounding area of the site and storage area", camera count, "hours/days of recording" | Asked, not mandatory | You state it | CBIC |
| Circular 36/2020 (MOOSWR, special warehouses) | Para 11 | Structure "fully closed from all sides"; "CCTV cameras at the gate(s)" with "a provision of accessing the same by customs officers" | Yes, at gates | None set | CBIC |
| ICEGATE 2.0 licence form (v1.16, Nov 2025) | Item 9(b)–(d) | CCTV Yes/No, number of cameras, "No. of hours/days of recording accessible at any point of time", each marked required | Asked, answer required | You state it | ICEGATE manual p.27 |
We read the CBIC portal texts of MOOWR 2019, MOOSWR 2020, the Public, Private and Special Warehouse Licensing Regulations, 2016, and both 2016 custody regulations. None contains "CCTV", "camera", "surveillance" or "video" (checked 15 Oct 2026). The word appears only in the circulars and the application form.
How the camera question actually reaches you
At application. Circular 34/2019 merges the private warehouse licence (Section 58) and the Section 65 permission into one form, Annexure A. Item 10, "Security facilities at the premises, existing or proposed", asks about a burglar alarm, CCTV, round-the-clock security staff and a fire safety audit certificate.
On ICEGATE. Under Circular 28/2025 (15 Nov 2025), Section 65 applications go through an ICEGATE 2.0 module. Its manual (18 Nov 2025) shows the CCTV questions as item 9, each with a red required-field mark. "No" is an allowed answer; leaving it blank is not.
At the site visit. Annexure A Part III asks the bond officer to record "findings… with respect to security, fire protection, IT enabled inventory management system, type of construction, area available for examination of goods". Circular 26/2016 gives the bond officer 15 days to visit and report, and the Commissioner 15 more days to decide.
At the decision. Circular 34/2019 para 13 tells Commissioners to "take into consideration the facilities, equipment and personnel put in place for secure storage of goods". It also says the regulations "do not mandate that a structure fully closed from all sides is a pre-requisite". Circular 26/2016 para 3 asks licensing authorities to use "good judgement" on security features, given the "type of site and nature of goods".
In practice, cameras are judged as one part of "secure storage".
Where warehouse types differ
- MOOWR unit (Section 58 + Section 65). No CCTV clause. The camera questions sit in the form; the legal test is regulation 8's "sufficient to control access".
- Public or private bonded warehouse (storage only). Same Circular 26/2016 form and the same "absence of CCTVs… acceptable in some situations" wording. Custody regulation 4 lists locks and doors, not cameras.
- Special warehouse (Section 58A, MOOSWR 2020). The only written camera instruction: Circular 36/2020 para 11 has the Commissioner ensure CCTV at the gates, with customs access to the feed.
- US buyer audits. Those camera rules come from CBP: see C-TPAT CCTV requirements.
Records customs does fix (and footage it does not)
MOOWR regulation 17(2) requires records of receipt, handling, storage and removal to be "preserved for a minimum period of five years from the date of removal of goods". Regulation 17(3) requires digital copies kept at another place, against "fire, theft, skillful pilferage or computer malfunction". Regulation 17(4) requires a monthly return within ten days of month-end.
These are accounting records. No customs warehousing text sets a retention period for camera footage (checked 15 Oct 2026). For the general picture, see how long a factory must keep CCTV footage.
Regulation 9(1) requires a one-time-lock on the vehicle when goods move from the port to the warehouse, between warehouses, or to the port for export. CBIC's RFID e-sealing circulars for bonded warehouses (19/2018 and 10/2020) "stand rescinded" under Circular 25/2020 of 18 May 2020. We found no later e-sealing circular for warehouses in CBIC's lists for 2020 to 2026 (checked 15 Oct 2026).
What to write in the form
| Form question (Annexure A 10(ii) / ICEGATE item 9) | A defensible answer | Why |
|---|---|---|
| CCTV covering site surroundings and storage area? | Yes, with a camera layout marked on the ground plan the form already asks for | The form asks for a plan with all entry and exit points |
| Number of cameras installed | The count you can show on the day of the visit | The bond officer visits and reports on security |
| Hours/days of recording accessible | The figure your NVR actually holds at your recording settings | A figure you cannot show at inspection undermines the application |
Size the disks with the CCTV storage calculator before you commit to a number.
What breaks in a factory
- The NVR overwrites sooner than the form says. Motion-heavy shop floors raise the bitrate, so the days on record shrink.
- Power cuts. Put the NVR and gate cameras on UPS.
- Gate views too wide. Regulation 9 is about sealed vehicles; a gate camera should show the truck and its seal.
- Workers on camera. Footage of people is personal data. Put up a worker CCTV notice.
When to call the bond officer
Ask the jurisdictional Commissionerate before filing whether it has issued a public notice on Section 65 applications. Circular 28/2025 directs Chief Commissioners to issue public notices on the port codes for Section 65 applications. Private Warehouse Licensing regulation 5 lets the Commissioner grant a licence "subject to such conditions as deemed necessary", so ask which conditions your Commissionerate attaches.
Mama reads a factory's existing cameras over RTSP/ONVIF and sends the owner a morning report on where machine hours were lost. It counts machine idle time, not people. More at askthemama.com. Leave an email or phone in the form below.
FAQ
Is CCTV mandatory for a MOOWR licence? No regulation requires it. The MOOWR (No. 2) Regulations, 2019 have no CCTV clause (checked 15 Oct 2026). The application form asks three required questions about CCTV, and Circular 26/2016 says absence of CCTV "shall be acceptable in some situations".
What security does customs require in a bonded warehouse? MOOWR regulation 8 requires signage, a computerised accounting system and "such facilities, equipment and personnel as are sufficient to control access". Circular 34/2019 para 13 cites boundary walls, gates with access control and personnel.
How many days of CCTV recording does customs want? No customs regulation or circular fixes a number (checked 15 Oct 2026). The form asks you to state the "hours/days of recording accessible at any point of time". The bond officer's site report covers security.
This page explains CBIC texts and is not legal advice. Commissionerates may set conditions in the licence. Confirm with your bond officer and a qualified customs advisor.